Services

 Essential Project Charts

2021.07.04~2022.03.18 Emergency dredging project for the inlet bay of Datan Power Plant.
2020.07.16~2022.08.30 Taipei Port South Wharf S07, S08 revetment and backline embankment construction project.
2022.03.18 ~2022.11.15, the dredging of the existing inlet bay of Datan Power Plant will continue.
2017.09.20~2022.11.21C031 Acting as an agent for the civil engineering and tram line engineering of the Taiwan Railway Nanping-Wangrong double track.

2012.04.26~2021.01.07 Linkou Power Plant Renewal and Expansion Plan Tubular Coal Bunker System Turnkey Project.
2016.09.06~2021.12.31 "Electrification Engineering Construction Plan of Taitung Chaozhou Section of Taiwan Railway South-Loop Railway" C811Z Chaozhou Fangliao Section Civil Engineering and General Mechanical and Electrical Engineering.

2011.11.01~2020.04.24Taiwan 9 line, Su-Hua highway, Gu-Feng tunnel (B3 tender)project
2011.11.01~2020.02.21Taiwan 9 line, Su-hua highway, Guan-yin tunnel (B2 tender)project.
2017.12.22~2020.04.18Taichung harbor dock No.106 new construction project.

Linkou power plant expansion plan New constructions of outlet diversion dike, northern breakwater, coal unloading terminal, the contact bridge

North 2008.10.03-2015.09.02 Taiwan Taoyuan international airport joint transit system construction project ,CE02 tender project.

south 2007.05.25- 2011.06.20 Interchange road constriction of Douliu City,Yunlin province

North 2008.06.26 2010.07.31 Hsin-Shen Viaduct Improvement and Chungshan 2nd Bridge Removal Project

North 2008.06.26 2010.07.31 Hsin-Shen Viaduct Improvement and Chungshan 2nd Bridge Removal Project

North 2008.06.26 2010.07.31 Hsin-Shen Viaduct Improvement and Chungshan 2nd Bridge Removal Project

North 2003.06.15 2009.02.27 Nei Hu Section project CB410 of Taipei Metropolitan Area Transit System - Muza extention line