 Kaohsiung Metropolitan Area Mass Rapid Transit System Metropolitan Line (Yellow Line) YC03 standard civil engineering, facility electromechanical and track turnkey project

Project Location:

South

Contract Price:

NT$30,692,089,774

Project duration:

3256 calendar days

Estimate completion date:

2032-12-31

Client:

Kaohsiung City Government Rapid Transit Engineering Bureau

Project Overview:
The scope of the YC03 bid project starts from the mileage 4K+427.106 (uplink) in front of the Y5 station and ends at the mileage 7K+457.134 (uplink) behind the Y18 station. The project includes a hidden shield tunnel section and an open-cover tunnel. section and four underground stations including Y5, Y16, Y17 and Y18. This sign is the section before the clarification of the Wujia section of the Yellow Line plan after it branches off from the Y5 station. There are Fengshan Chishan area, Fengshan Administrative Center, Fengshan High School and Weiwuying Art Center along the line, and it connects with the Y17 station. The transfer of Taiwan Railway's Zhengyi Station and the transfer between Y18 Station and Orange Line O10 Station will give priority to the road section for the first phase of operation in the future.
The main project content includes but is not limited to civil engineering, structure, land, water conservation, architecture, landscape, signs, environmental protection, elevators, escalators, water and electricity, fire protection, machinery, environmental control, LESS system and other detailed design and construction.