Services

 Huadong Area Railway Double-track Electrification Project CB02 from Guangfu to Ruisui Civil Engineering and Track Engineering

Project Location:

East

Contract Price:

NT$8,838,000,000

Project duration:

1857 calendar days from the

Estimate completion date:

2032-01-15

Client:

Railway Bureau, MOTC

Huadong Area Railway Double-track Electrification Project CB02 from Guangfu to Ruisui Civil Engineering and Track Engineering

Project Overview: The main project content includes the section from Guangfu Township, Hualien County to Ruisui Township, Hualien County, with a total length of approximately 19.36 kilometers (K43+200.0~62K+560.0), but is not limited to:
1. Road engineering: The main work is the construction of railway roadbed engineering, cable troughs, tram line foundations, level crossing door-type protective frames and retaining wall facilities, etc.
2. Bridge engineering: The main work includes structures such as foundation piles, foundations, abutments, piers and superstructures.
3. Station and construction projects: The main work is to add the first platform and canopy, extend the second platform and other structures.
4. Construction site office: The main job is to be responsible for the construction, cleaning and maintenance of office buildings for Party A (including the supervision unit) during the construction period of the project.
5. Signal platform project: In order to meet the needs of railway signal engineering, a new signal platform will be built within the scope of this project.
6. Drainage project: The main work is to set up drainage roads in conjunction with the embankment and retaining wall, and the cross waterway will be extended in conjunction with the embankment section.
7. General electromechanical engineering: The main work is lighting, broadcasting, CCTV, train arrival warning lights and other systems.