 Taichung Combined Cycle Power Plant Project -Circulating Water Pump House and Tunnel Project

Project Location:

Central

Contract Price:

3749800000

Project duration:

1848 calendar days from the

Estimate completion date:

2027-01-31

Client:

Nuclear Power and Thermal Power Engineering Division of Taiwan Electric Power Co., Ltd.

The Taichung Power Plant's gas-fired unit plan is expected to plan the construction of two double-cycle gas-fired units for the pumping room of the circulating water system and the construction of new culverts.
Engineering Content:
Coordinating engineering, soil and water conservation engineering, port-ring bridge, pumping room (mainly divided into upper and lower structures), cooling circulating water culvert engineering (including inlet culvert, pressure tower, cross section and outlet culvert), cable culvert engineering , Cleaning and restoration work, hydraulic machinery equipment supply and installation engineering, pumping machine room overhead crane equipment supply and installation engineering, fire-fighting equipment agency fees and technician visas, seabed dredging, etc.