Project statement:
Total lenth2.035 km, which include(1) Bali area approach the bridge, (2) Danjiang bridge-main brigge section,(3) Tamsui river area approach the bridge and the ramp. Main construction works as follows:
(1)Launching method steel box girder bridge.
(2)Movable scaffolding system precast steel box girder bridge.
(3)Cast-in-site precast steel box girder bridge.
(4)Cast-in-site steel panel girder bridge.
(5)Main road and approach road retaining wall.
(6)Vehicles thought by the Box culvert.
(7)Traffic system、water drainage system、monitoring system and supplementary geological drilling、lighting device、miscellaneous、traffic maintenance、health and safety、environmental facilities、quality control and the other ancillary works.